Toluene diisocyanate manufacturer Knowledge Yulong concrete pump agent instruction manual

Yulong concrete pump agent instruction manual

Yulong concrete pump agent instruction manual

Yulong mixed doubts about the two models: white and light red. There is no difference in the process of use. It is the same convenient and simple, without any difference, but the anticorrosive type will play a very With good protection, there will be a certain difference in the pipe comparison after one or two years of use. Pipe moisturizer needs to be used according to the instructions for use. If it is not used according to the instructions, it will not achieve obvious results, and in serious cases, the pipe may be blocked. If used properly and according to the instructions, the lubricant is used to replace pump mortar, which is more energy-saving, environmentally friendly and convenient.

1. Product Description

This product is made of a variety of polymer materials. By mechanical or manual stirring at room temperature, it will quickly dissolve within 2-4 minutes to form a light red, stable viscous liquid, which can realize the function of lubricating pump pipelines.

2. Usage

Use the following table to configure the solution according to the type of concrete delivery equipment and the length of the delivery pump pipe. Pour the product into the corresponding volume of water and stir for 2-4 minutes to completely dissolve. Once the solution is thick and lubricated, you can use it.

When using a car to pump concrete, the diluted aqueous solution of the wetting pipe is slowly injected into the inner wall of the pump hopper (or water can be directly put into the hopper to dilute the wetting agent), and then inlet from the pump pipe The other side of the material opening slowly unloads concrete into the hopper. When the concrete covers the water inlet of the pump, you can start pumping under pressure so that all the aqueous solution flows in front of the concrete pipe as much as possible.

When pumping concrete on the ground, in order to prevent residues in the pump pipe, the pump pipe should be cleaned according to the above steps, and the water in the hopper and pipe should be drained.

Recommended use:

1. First send 60 to 70 kilograms of water to the concrete pipe at the outlet of the pump truck, 2. Start stirring. While stirring, add two bags of moisturizer and stir for 1 minute and 3 minutes. You can stop stirring, rest for 2 to 3 minutes, and then stir for 1 minute. If you find that the lubricant is obviously thickened and there is stringing, you can slowly unload the concrete from the other side of the pipe mouth. 4. Squeeze all the lubricant into the front of the pump tube as much as possible to achieve the function of moisturizing the tube. After the lubricant comes out of the pipe, it needs to be drained outside.

3. Notes

1. There is no residue in the delivery pump pipe. The connections of the pump tubes should be sealed and leak-free.

2. When the first concrete is pumped, the slump degree of the concrete should be increased by 2-3 cm, and the separation should be ensured.

3. In the summer, water should be pumped to lower the temperature of the pipes.

4. The solution discharged from the pump pipe should not be poured into concrete structures.

5. Let the pipe solution flow into the pump pipe as much as possible.

6. This product is non-toxic and harmless. If it accidentally gets into your eyes, rinse immediately with water.

7. This product should be cool, dry and stored. It can be used and kept for 24 months. </p

This article is from the Internet, does not represent the position of Toluene diisocyanate reproduced please specify the source.https://www.allhdi.com/archives/18624

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: sales@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Back to top
Home
E-mail
Products
Search