Toluene diisocyanate manufacturer Knowledge Does pipe moisturizing agent have any effect on concrete structure?

Does pipe moisturizing agent have any effect on concrete structure?

Does pipe moisturizing agent have any effect on concrete structure?

First of all, we must have a deep understanding of the raw materials for the production of lubricants. Yulong pipe lubricant is produced from high molecular polymer materials. After many experiments by scientific researchers, it has been proved that Yulong pump truck lubricant has no corrosive effect on pumping equipment and building steel. It reaches food-grade standards and is environmentally friendly and environmentally friendly. Safety, efficiency, money saving, labor saving and other characteristics. Experiments have proven that Yulong pipe moisturizer will not segregate concrete and has no impact on the strength of concrete. Yulong pipe moisturizer has been playing a great role in construction projects for many years, completely replacing the original cement sand paddle pipe moisturizer. The lubrication agent has only one function, replacing the original cement mortar for lubrication. The lubrication solution after lubrication is required to be discharged outside the formwork and cannot be poured directly into the concrete structure. Only a thin layer of lubrication solution adheres to the inner wall of the delivery pipe. I can't tell you it has any effect on concrete.

Through the previous understanding of the production materials of lubricant, I believe that everyone will not be so unfamiliar with Yulong lubricant. The most important thing is the correct way to use the lubrication tube. Through more than ten years of construction and application, Yulong Materials has summarized a very complete set of usage methods. The methods of use of vehicle pumps (commonly known as sky pumps) and ground pumps are slightly different. The dosage of the sky pump is that one bag of Yulong pipe moisturizer is enough for pipes within 50 meters. Use 40 to 50 kilograms of clean water to prepare it at the construction site. For pipes longer than 50 meters, use 2 bags. The lubricant solution can be prepared directly in the hopper. First, follow the instructions for use and prepare water and lubricant. Slowly pour the lubricant into the water and stir while pouring. When the solution is stirred into a viscous state, it can be used. Just moisturize the pipe according to the traditional cement sand paddle moistening method. After moistening the pipe, the lubricating agent solution needs to be discharged outside the template. Here we will focus on how to use the floor pump and the amount of lubricant. The floor pump is twice as much as the sky pump. Some people may ask why the amounts of pump pipes of the same length are different. That's because the use environment of the pump tube and the process of the pump tube cannot meet Tianpump's standards. The lubrication solution needs to be thicker and more lubrication solution needs to adhere to the inner wall of the pump tube to achieve the best lubrication effect.

1. Dosage of ground pump lubricant:

For pump pipes within 50 meters, 1 bag of Yulong lubricant and 40~50 kg of clean water.

50~100 meters of pump pipe, 2 bags of Yulong pipe moisturizer, and 80~100 kg of clean water.

For a pump pipe of 100~150 meters, 3 bags of Yulong pipe moisturizer and 120~150 kg of clean water are required.

Above 150 meters, you need 4 Yulong pipe moisturizer and 150~180 kg of clean water.

2. Precautions:

1. The usage is the same as that of the Tianpump. Due to the different temperatures across the country, if the temperature reaches above 30 degrees, it is necessary to use lubricant before mixing. The purpose of pumping clean water through the pump truck is to flush foreign matter in the pump pipe and cool the pump pipe to enhance the adhesion effect of the lubricant.
2. The lubricant solution used to moisten the pipes must also be placed outside the template and cannot be poured directly into the structure. The lubricant solution used to moisten the pipes is relatively slippery and workers must not step on it during construction. , to avoid slipping. The moisturizing solution will evaporate naturally after 72 hours without leaving any traces. </p

This article is from the Internet, does not represent the position of Toluene diisocyanate reproduced please specify the source.https://www.allhdi.com/archives/18633

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: sales@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Back to top
Home
E-mail
Products
Search