Toluene diisocyanate manufacturer Market Markor Chemical s 100 000 tons of BDO enters the production preparation stage

Markor Chemical s 100 000 tons of BDO enters the production preparation stage

Currently, the Phase IV 100,000-ton/year BDO project of Zhongtaimeike Chemical Co., Ltd., located in Bayingoleng Mongolia Autonomous Prefecture, has entered the production preparation stage. At the same time, all aspects of work such as personnel training and preparation of safety production operating procedures are carried out simultaneously, striving to achieve the goal of “starting up to production” as soon as possible.

Construction site of Zhongtai Meike Chemical BDO Phase IV Project

“After the wastewater is pretreated, the combined use of anaerobic and aerobic microorganisms can achieve the purpose of purifying chemical wastewater…” On February 8, in the conference room of Zhongtai Meike Chemical, Cao Mingdong, an engineer of the production management department, was talking to the project personnel of the fourth phase Conduct training on sewage system management.

The fourth phase of the 100,000-ton/year BDO project of Zhongtai Meike Chemical Co., Ltd., from the groundbreaking to the manufacture and entry of 17 large pieces of equipment, to the prefabrication of pipelines, the installation of the main equipment and equipment, the completion of machinery, the delivery ceremony, and finally to the three inspections and four determinations of production Prepare. Numerous Zhongtai people leaned down to seek development without distraction, and effectively transformed the project planning drawings into a grand blueprint for the construction and development of Zhongtai Group.

“The 2023 work conference of Zhongtai Group focuses on the overall development situation, and proposes to continue to implement the ‘six major strategies’ of party building, industrial strengthening, market establishment, innovation, reform and safety, and solidification of enterprises, which will point out the way for our development With full confidence, all departments of Zhongtai Meike Chemical Co., Ltd. will cooperate closely, aim at key areas, key links, and key issues, reverse the construction period, pay close attention to safety, grasp quality every centimeter, grasp progress every minute and every second, and rush to the construction period wholeheartedly. Step by step, high-quality, high-standard and high-efficiency promote project construction to speed up and shift.” Song Zhimin, Secretary of the Party Committee and Chairman of Zhongtai Meike Chemical, said that the fourth phase of Meike Chemical will be put into production soon, and at the same time, the fifth phase of BDO and the two major reserve projects of PBAT It is making steady progress.

This article is from the Internet, does not represent the position of Toluene diisocyanate reproduced please specify the source.https://www.allhdi.com/archives/630

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: sales@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Back to top
Home
E-mail
Products
Search