Toluene diisocyanate manufacturer Knowledge How long does it take for the pumping agent to solidify when it is driven into concrete? Shanxi concrete pipe moistening agent manufacturer

How long does it take for the pumping agent to solidify when it is driven into concrete? Shanxi concrete pipe moistening agent manufacturer

How long does it take for the pumping agent to solidify when it is driven into concrete? Shanxi concrete pipe moistening agent manufacturer

The setting time of wetting agent in concrete depends on many factors, such as the amount of wetting agent in concrete, ambient temperature, water-binder ratio in concrete, and mix ratio of concrete , types of cement used in concrete, etc. Normally, the setting time of wetting agent in concrete ranges from a few hours to a few days, depending on the above factors. If you require a precise setting time, it is recommended to consult a professional experienced in concrete technology. </p

This article is from the Internet, does not represent the position of Toluene diisocyanate reproduced please specify the source.https://www.allhdi.com/archives/11563

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: sales@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Back to top
Home
E-mail
Products
Search